Legend:
CLD: Construction of a new large dam
CSD: Construction of a new small dam
RLD: Rehabilitation of an existing large dam
RSD: Rehabilitation of an existing small dam
RB: Refurbishment of an existing dam
EXP: Expertise
AAR: Presence of Alkali-Aggregate Reaction
| Work and location | Owner | Category | Performed work |
| Mc Cormick GS, Côte-Nord, QC (350,6 MW) |
Hydro-Québec, Alcoa | RLD, AAR | Intake gates and embedded parts rehabilitation |
| Ménihek GS, North of Quebec, QC (17,2 MW) |
Hydro-Québec | RLD | Intake gates and embedded parts rehabilitation |
| Marches naturelles GS, Quebec, QC (4,5 MW) |
Boralex | RSD | Draft tube gate rehabilitation |
| Paugan GS, Outaouais, QC (204 MW) |
Hydro-Québec | RLD | Intake gates and embedded parts rehabilitation. New bulkhead gates |
| Beauharnois GS, QC (1903 MW) |
Hydro-Québec | RLD, AAR | Intake gates and draft tube gates design |
| Chute des passes GS, Saguenay, QC (833 MW) |
Alcan EEQ | RLD | Intake gate rehabilitation |
| Chelsea GS, Outaouais, QC (152 MW) |
Hydro-Québec | RLD, AAR | Intake gates and embedded parts rehabilitation |
| Rapide Farmers GS, Outaouais, QC (104 MW) |
Hydro-Québec | RLD, AAR | Intake gates and embedded parts rehabilitation |
| Chute à Caron GS, Saguenay, QC (222 MW) |
Alcan EEQ | RLD | Cofferdam gate for embedded parts rehabilitation |
| Chute du Diable GS, Lac St-Jean, QC (224 MW) |
Alcan EEQ | RLD | Intake gates and embedded parts rehabilitation and tender documents |
| Chute Savane GS, Lac St-Jean, QC (245 MW) |
Alcan EEQ | RLD | Intake gates and embedded parts rehabilitation and tender documents |
| Shipshaw GS, Saguenay, QC (947 MW) |
Alcan EEQ | RLD | Intake gates and embedded parts rehabilitation and tender documents |
| Sept-Chutes GS, St-Férréol les neiges, QC (22 MW) |
Hydro-Québec | RSD | Expertise for frasil gate and pentstocks |
| Churchill Falls GS, NL (5428 MW) |
Nalcor | RLD | Rehabilitation of intake gates |
| La Tuque GS, La Tuque, QC (294 MW) |
Hydro-Québec | RLD, AAR | Rehabilitation of intake gates phase 1 |
| La Tuque GS, La Tuque, QC (294 MW) |
Hydro-Québec | RLD, AAR | Floating bulkheads for intake. Detailed tender documents |
| La Tuque GS, La Tuque, QC (294 MW) |
Hydro-Québec | RLD, AAR | Floating bulkheads draft tube. Detailed tender documents |
| Rapide 2 GS, Abitibi-Témiscamingue, QC (67 MW) |
Hydro-Québec | RLD, AAR | Intake Cofferdam gate design |
| Pont Arnaud, Chicoutimi, QC (5.6 MW) |
Pomerleau / Hydro-Québec | RLD | Expertise of the expansion joints of the penstock |
| Pont Arnaud, Chicoutimi, QC (5.6 MW) |
Pomerleau / Hydro-Québec | RB | Refection of the intake gates |
| Isle maligne GS, Saguenay, QC (448 MW) |
Alcan EEQ | RLD | Expansion joint for penstock |
| Atelier de Shawinigan, Shawinigan, QC | Alcan/Hydro Québec | EXP | Research and development in embedded parts rehabilitation |
| Dufferin GS, Outaouais, QC (37,3 MW) |
Qualimec/Mac Laren | RSD | Intake gate rehabilitation |
| Magpie GS, Côte-Nord, QC (40,6 MW) |
Hydroméga | CLD | Floating Trashrack design and tender documents |
| Sault-aux-Cochons GS, Côte-Nord, QC (6 MW) |
Cascade / TDA | CSD | Penstock design (1,8m.Ø) |
| Chute-de-la-Chaudière GS, Lévis, QC (25 MW) |
Roche et Innergex | CSD | Penstock design (4.5m.Ø) |
| Lapulpe GS, Rimouski, QC (3,7 MW) |
Soliger et Cascade | CSD | Penstock design (2.5m.Ø) |
| Portneuf 2 GS, Côte-Nord, QC (11,75 MW) |
Innergex | CSD | Penstock design (4.5m.Ø) |
| Sainte-Marguerite-3, Côte-Nord, QC (884 MW) |
Hydro-Québec | CLD | Penstock design (4.5m.Ø) |
| Toulnustouc GS, QC (526 MW) |
Hydro-Québec | CLD | Penstock design (5.5m.Ø) |
| Rivière Portneuf, GS PN1, PN2, PN3, Côte-Nord, QC (11,75 MW) |
CSL et Innergex | CSD | Draft tube gates rehabilitation |
| Beauharnois GS, Beauharnois, QC (1903 MW) |
Hydro-Québec | RLD, AAR | Custom automotive travelling plateform for transformer |
| Mactaquac, NB (672 MW) |
NB Power | RLD, AAR | Trash rack design |
| Bird II GS, Pont Rouge, QC (2,8 MW) |
Soliger et Cascade | RSD | Design of downstream safety gate and embedded parts |
| Laforge-2 GS, Baie-James, QC (319 MW) |
Hydro-Québec | CLD | Gate, trashrack and embedded parts design |
| Chutes hemming GS, Drummondville, QC (29 MW) |
Hydro-Québec | RLD, AAR | Intake gates and embedded parts rehabilitation |
| Bryson GS, Outaouais, QC (56 MW) |
Hydro-Québec | RLD, AAR | Intake gate and embedded parts rehabilitation |
| Umbata Falls GS, ON (23 MW) |
CRT | CSD | Intake and spillway design, tender documents |
| North Brook Lyons Falls GS, NY, USA (8,5 MW) |
NPA | RSD | Intake gates rehabilitation |
| Rhéaume Dam, Gatineau, QC (119 MW) |
Brookfield Renewable | EXP | Technical expertise for major rehabilitation of the intake gate |
| Bay d’Espoir Dam, Bay d’Espoir, NL (604 MW) |
NL Hydro | EXP | Technical expertise on intake gate, superstructure, embedded parts and hoist |
| Star Lake GS, NL (18.4 MW) |
NL Hydro | EXP | Technical expertise on intake gate and embedded parts |